• Home
  • Post a press-release
  • Visibility packages
  • Subscribe email updates
  • Event Calendar
  • Contact

For Immediate Release | Official News Wire for the Travel Industry

Where press releases are breaking news

  • Home
  • Post a press-release
  • Visibility packages
  • Subscribe email updates
  • Event Calendar
  • Contact

Fraport AG Begins Construction of New Truck Parking Lot in CargoCity South

September 30, 2020 by PressEditor

Today, Fraport AG began construction of a new truck parking lot at Frankfurt Airport’s CargoCity South. The roughly 14,500-square-meter lot is located within the airport’s operational area near Airport Gate 32 in the southern part of Frankfurt Airport (FRA). The new lot will provide space for another 61 trucks, bringing the total truck parking spaces available at CargoCity South to 135. The plans also include state-of-the-art sanitary facilities with shower rooms for the drivers. The parking lot will take around one year to build and is set to be operational by the end of 2021.

Max Philipp Conrady, head of Fraport AG’s Cargo Infrastructure and Development unit, said: “The dedicated truck parking area will further expand parking capacity in CargoCity South. It will provide ample space and modern facilities, as well as improve cargo processes for all partners in this busy area. The coronavirus pandemic has once again demonstrated that CargoCity South is an important transshipment hub for vital goods. We believe that the airfreight sector will continue to be pivotal for the distribution of key products from around the globe. This is why we wish to quickly put in place the additional parking spaces so we can offer our customers even better service.”

Shipping and logistics companies sometimes have to wait for their truck time slot until they can access the relevant logistics warehouse in CargoCity South. In the future, they can bridge the time either at the existing truck parking lot close to Airport Gate 31 or at the new parking lot now under construction at Airport Gate 32.

This parking facility will be equipped with five barrier gates for vehicles entering or exiting. The sanitary rooms will be free to use for parking lot customers. The overall construction cost is expected to be in the low single-digit million euro range. In addition to the truck parking spaces, the new lot will also provide 23 spaces for cars and 2 for buses. These spaces will be separated from the truck area by a fence in order to allow access from the public area of CargoCity South.

Media Contact:  Christian Engel, Corporate Communications, Media Relations, Telephone +49 69 690-30713, c.engel@fraport.de

Share this:

  • Twitter
  • Facebook

Related

Filed Under: Travel & Tourism Tagged With: CargoCity, Coronavirus, Fraport, Fraport AG, Max Philipp Conrady

HANDS:Wash them often  ELBOW:Cough into it  FACE:Don’t touch it  SPACE:Keep safe distance  HOME:Stay if you can


Click here to support our hard-working global team and their families!


Search



Recent Articles

  • Newly formed Thai Airlines Association names inaugural President
  • American Airlines and Deloitte Pioneer Market-Based Solution to Reduce Carbon Emissions from Air Travel
  • Provincial entry and exit rules as Thailand further eases COVID-19 control measures from 22 February 2021
  • Coronavirus Disease 2019 (COVID-19) situation in Thailand as of 26 February 2021, 11.30 Hrs.
  • ‘Lutetia by Lebua: The Vertical Pop-up’ immersive experience open from 2 March to 25 April 2021
  • Hyatt House Nashville Airport Celebrates Official Opening
  • Malta: A Mediterranean Destination Filled with Authenticity and Curated Exclusive Experiences
  • Redeem AAdvantage Miles for at-Home COVID-19 Testing Before Take-Off
  • Fair and United Approach Needed in Global Distribution of Vaccines – Bartlett
  • Hyatt Announces Plans for a Hyatt Regency Resort and Spa and Residences in Vietnam's Popular Beach Destination, Ho Tram

Copyright © 2021 · Metro Pro on Genesis Framework · WordPress · Log in